Test reports
Checklists and results

All project-related information - from the specification to the spare part - structured, versioned and clearly assigned.
Discuss your projectPROJECT DOCUMENTS
Plans, drawings, releases, test reports and other documents are centrally structured.
This is how you keep an overview – in the project and beyond.
| Name | version | Modified on | Status | Size |
|---|---|---|---|---|
| Floor plan – Room 203.pdf | V03 | 12.03.2024 | Released | 2.4 MB |
| Furniture list – Hotel Cologne.xlsx | V05 | 10.03.2024 | Released | 1.1 MB |
| Drawing – bedside table NT01.pdf | V03 | 08.03.2024 | Released | 3.2 MB |
| Test report – oak surface.pdf | V02 | 28.02.2024 | Released | 1.8 MB |
| Material release – Oak.pdf | V03 | 15.03.2024 | Released | 0.9 MB |
| Delivery note – Room 203.pdf | V01 | 18.05.2024 | Released | 0.6 MB |
No matching documents found.
Illustrative document view · The files shown are examples.
DOCUMENTATION & TRACEABILITY
All tests, approvals and measures are documented project-related and linked to the corresponding products, batches and suppliers.
Checklists and results
Visual and technical evidence
Link to room, area and supplier
Clear decisions and responsibilities

Drawings, specifications
Quality and measurement protocols
Production, delivery, assembly
Maintenance and spare parts
SERVICE CASE · SC-2026-041 · EXEMPLARY REPRESENTATION
Information remains clearly assigned throughout the entire service process -
from the affected component to the documented solution.
Each step is clickable. Select a step to see the details.
Room 203: The drawer does not close properly. Report, photos and affected equipment are documented.
CapturedRequest service